Reports until 16:05, Friday 14 March 2014
LHO VE
kyle.ryan@LIGO.ORG - posted 16:05, Friday 14 March 2014 (10763)
Bake of RGA recently connected to BT (Y1) near GV6 to be extended over this weekend
Clean-up of RGA is slow at the reduced temperatures used -> RGA is isolated from the BT via (2) series-connected closed 1 1/2" valves