jodi.fauver@LIGO.ORG - posted 18:45, Wednesday 14 September 2011 (1398)
BSC-6 ICC
The ICC crew finished wiping down the lower sections of the chamber this morning. Then the entire chamber, including doors, was gently vacuumed as called for in the procedure. By the end of the day, inspection had been completed. The dome will be replaced on the chamber and FTIRs will be shipped tomorrow. There may be some delay in replacing the door blanks since Clean-and-Bake is somewhat overwhelmed at this point in time. 