- EY: BSC6 H2 ETMY ISI craned on to test stand after cleaning by Kris and the crew.
- Many SUS visitors on site for fiber welding.
- Swagelok delivery for Hugh. Praxair delivery at 4:15pm at MY LN tank.
- TMS work ongoing at EY, CraigC and ChrisG assisting.
- PeterK, BennoW, and AEI/LZH group assisting with PSL installation
- Sam Waldman and squeezers continue investigating H1 OMC issues. Squeezers locked H1 this evening, LVEA in laser hazard.
- Two Control Room projectors need their bulbs replaced.