TMS alignment looks very good (despite ugly beam), and I think we're done with the in-chamber work.
We noticed that the pointing to the QPDs were off after last week's alignment process, and touched up the injection path on ALS table a bit.
After that, we used the first green picomotor to center the beam on the first folding mirror (bigger of the two folding mirrors) on the telescope because it looked off, and this made the centering on the secondary great. Retro reflection is very good.
Dichroics don't seem to be perfect, as witnessed by the existence of green beam in the red QPD path. A small fraction of green retro reflection is reflected off of the red pico mirror. This green beam is not centered in the red QPD path, and not hitting red QPDs. This might be due to the wedge in the splitter and ETM combined with the dispersion, but we don't know for sure. Though we have picos for red QPD path, and though we don't use red QPDs for the one arm test, we'll make some calculation so we'll know in the future installations if this green beam can be used for the alignment of the red QPD path.
We've done some close-up work like centering the OSEMs, checking apparent touching (there was none) and checking cables rubbing each other (there were subtle ones, which were fixed but not completely).
We took many pictures which will be posted to resource space by Alberto and Dan.