Reports until 16:46, Thursday 12 September 2024
LHO General
ibrahim.abouelfettouh@LIGO.ORG - posted 16:46, Thursday 12 September 2024 (80067)
OPS Day Shift Summary

TITLE: 09/12 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 150Mpc
INCOMING OPERATOR: Tony
SHIFT SUMMARY:

IFO is in NLN and OBSERVING (since 19:43 UTC)

It's been a good day both for observing and comissioning.

OBSERVING:

We needed to do an initial alignment after the comissioning period ended but were able to fully automatically get to NLN after that and have stayed there since.

Lockloss 17:37

COMISSIONING:

Accepted SDFs attached.


LOG:

Start Time System Name Location Lazer_Haz Task Time End
23:58 SAF H1 LHO YES LVEA is laser HAZARD 18:24
15:19 FAC Karen Optics, Vac Prep Labs N Technical Cleaning 15:42
16:08 OPS Mitchell, TJ EX N Dust Monitor Pump Check 17:08
Images attached to this report