TITLE: 09/26 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: Ibrahim
SHIFT SUMMARY:
OMC issues
Ether Cat issues
NLN reached at 20:27 UTC!
CAL and PEM Team were able to get some Comissioning done in the later half of the day.... but....
PI 24 Ring up.... -> Lockloss before Sheila could finish her work. :(
ETMY Ring Heater turned on, so ETMY Will start to drift.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
23:58 | SAF | H1 | LVEA | YES | LVEA is laser HAZARD Open ViewPort on HAM3! | 18:24 |
15:02 | FAC | Christina | Recycling bins | N | Using the fork lift to move some heavy items into recycling. | 16:02 |
16:08 | PEM | Robert | LVEA | Yes | Removed viewport and Setting up for commissioning | 17:08 |
17:46 | Fac | Karen | Optics lab & Vac Prep | N | Technical cleaning | 18:31 |
18:35 | EE | Sigg & Fernando | LVEA | Yes | Checking pinout for EthrCat | 20:09 |
19:58 | EE | Sigg, Fill | HAM7 racks | Yes | Removing and replacing Whitening boards | 19:38 |
20:00 | EE | Fernando & Fil | LVEA | Yes | OMC DCPD troubleshooting | 20:09 |
20:53 | EE | Fil | MidY | N | Gathering Parts to fix te Spare OMC Whitening Chassis | 21:53 |
21:12 | PEM | Robert | LVEA | YES | HAM2 PEM Injections | 22:12 |
22:47 | PEM | Robert | LVEA | Yes | Putting the Viewport back on and turn PEM equipment off. | 23:47 |