Reports until 16:45, Tuesday 01 October 2024
H1 General
anthony.sanchez@LIGO.ORG - posted 16:45, Tuesday 01 October 2024 (80407)
Tuesday Eve Shift Start

TITLE: 10/01 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Microseism
OUTGOING OPERATOR: Ibrahim
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 21mph Gusts, 15mph 3min avg
    Primary useism: 0.08 μm/s
    Secondary useism: 0.81 μm/s
QUICK SUMMARY:
Secondary Micro Seism is elevated,
The Vacuum team is still working on an ION pump annulus swap out on the floor of the LVEA.
Locking attempts will start once the VAC team is done and a sweep of the LVEA has been completed.
 

 

Images attached to this report