Reports until 13:42, Wednesday 02 October 2024
H1 General
camilla.compton@LIGO.ORG - posted 13:42, Wednesday 02 October 2024 (80432)
OPS Day Shift End

TITLE: 10/02 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 151Mpc
INCOMING OPERATOR: Tony
SHIFT SUMMARY: Short locks this shift but there is still some wind and microseism.  We reduced input power to 60W from 61W.
LOG:

All re-locks today and last night were fully automatic.

Start Time System Name Location Lazer_Haz Task Time End
15:01 FAC Karen Optics lab/Vac Prep N Technical Cleaning 15:24
15:43 FAC Karen MY N Technical Cleaning 16:42
16:21 SQZ Sheila SQZT0 LOCAL Realign SHG fiber 16:52
16:39 FAC Chris MX,MY N FAMIS tasks: fire and first aid kit checks 17:16
17:04 FAC Karen Woodshop/Fire pump room N Technical cleaning 17:53
19:00 PEM Robert/Anamaria/Lance X-arm N CE test setup, staying outside Still out
19:57 SQZ Sheila LVEA N Grabbing parts 20:01