Reports until 16:30, Thursday 03 October 2024
LHO General
ryan.short@LIGO.ORG - posted 16:30, Thursday 03 October 2024 (80452)
Ops Day Shift Summary

TITLE: 10/03 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Tony
SHIFT SUMMARY: Busy today today, from multiple lock acquisitions to commissioning activities this morning. Unfortunately, not much observing time for H1 today, but's relocking now, currently up to MAX_POWER.

LOG:

Start Time System Name Location Lazer_Haz Task Time End
14:47 FAC Tyler, MM All Buildings n Glycol samples 17:57
15:07 TCS Camilla LVEA n Getting parts 15:24
15:10 FAC Karen Opt/Vac Labs n Technical cleaning 15:37
15:35 ISC Sheila LVEA/Opt Lab n Gathering parts 15:46
15:47 SQZ Sheila, Camilla LVEA Local Moving OPO crystal 19:03
17:24 ISC Elenna Remote n Testing PRCL FF 18:22
17:58 FAC Tyler, Richard, Trane MY n Looking at chillers 19:21
18:26 CDS Fil CER n Taking pictures 18:31
18:44 CDS Fil FCES n Checking extension cords 18:52
18:44 VAC Gerardo LVEA n Replace pump supply on HAM1 19:05
20:07 SQZ Sheila LVEA Local Checking PD on SQZT7 20:36
20:59 SQZ Sheila, Camilla LVEA Local Fixing OPO alignment 21:51
21:58 PEM Robert, guests Y-arm n CE equipment demonstration Ongoing
21:58 PEM Anamaria, guests X-arm n CE equipment demonstration Ongoing