TITLE: 11/22 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: None
SHIFT SUMMARY:
NPRO Swap work continued today by Jason, Vicky, and Ryan, with quite a bit of progress this morning, but the PSL crew is still on the floor (currently seeing flashes of RefCav Trans) and so the status for the return to observing is not clear for tonight. (I will be in for my DAY shift tomorrow.)
Trend of the new PSL HV monitor H1:PEM-CS_ADC_4_28_2K_OUT_DQ is attached. It has been flat/constant for most of the last 24+hrs, but in the last couple hours it has moved a bit (correlated with PMC locking or ISS?).
LOG:
- 1553-1627 LVEA clean-up/restocking mainly around the h1 psl & then Optics lab (karen)
- 1645-2045 NPRO swap (jason,vicky)
- 2150-NPRO swap continues (jason, vicky, ryan)
- 1705 alsy work from CR (tj)
- 2200 Continuing after lunch
- 1711 EY Wind Fence inspection (mitch, jim)
- 1736-1752 laser hunting (camilla)
- SEI: itmx
- 1752-1759 h1 msl tv monitor powered on (tony)
- 1800 replacing ceiling light fixtures in PCal lab which also required clean room move (Eric w/ help from tony, gerardo, fil)
- 2030-2100 Photos of temporary seismometer (lance)
- 2115-2145 Mounting seismoeter in Beer Garden area (jim, neil)
- 2120-2145 UW Physics tour (camilla)
- 2155-2240 EX for taking photos, Jim thing, "microphone", magnetometer (lance)
- 2241-2303 EY to take similar photos (lance)
- 2155-2208 PSL racks (richard)