TITLE: 02/19 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
INCOMING OPERATOR: Ibrahim
SHIFT SUMMARY: Maintenance day. Notable tasks from today's maintenance are below. We recently had another lock loss, we have started initial alignment and will start main locking shortly.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
19:34 | SAF | Laser Haz | LVEA | YES | LVEA is laser HAZARD!!! | 06:13 |
15:33 | FAC | Kim, Nelly | Opt Lab | n | Tech clean | 15:57 |
15:51 | VAC | Ken | EX | n | Compressor electrical | 17:19 |
15:52 | VAC | Janos, contractor | EX | n | Compressor work | 17:35 |
15:57 | FAC | Kim, Nelly | EY, EX, FCES | n | Tech clean | 18:40 |
15:59 | FAC | Eric | Mech room | n | Heater 3a replacement | 17:27 |
16:58 | - | Christina, truck | VPW | n | Large truck delivery to VPW | 16:59 |
17:27 | CDS | Jonathan, Fil, Austin | MSR, CER | n | Move temp switch and camera server | 20:10 |
17:28 | VAC | Ken | EY | n | Disconnect compressor electrical | 19:49 |
17:35 | VAC | Travis | EX | n | Compressor work | 18:33 |
17:46 | VAC | Gerardo, Jordan | MY | n | CP4 check | 19:16 |
17:49 | SQZ | Sheila, Camilla | LVEA | YES | SQZ table meas. | 19:39 |
17:50 | SUS | Jason | LVEA | yes | PR3 OpLev alignment | 18:04 |
18:19 | SUS | Jason, Ryan S | LVEA | YES | PR3 OpLev recentering at VP | 21:05 |
18:19 | SUS | Matt, TJ | CR | n | ETMX TFs for rubbing | 21:21 |
18:37 | FAC | Tyler | Opt Lab | n | Check on lab | 19:03 |
18:39 | CDS | Erik | CER | n | Check on switch | 19:16 |
18:41 | FAC | Kim | LVEA | yes | Tech clean | 19:51 |
18:56 | VAC | Travis | Opt Lab | n | Moving around flow bench | 19:03 |
18:58 | PEM | Robert | LVEA | yes | Check on potential view ports | 19:51 |
19:04 | FAC | Tyler | Mids | n | Check on 3IFO | 19:25 |
20:21 | VAC | Gerardo | LVEA | yes | Checking cable length on top of HAM6 | 20:50 |
20:27 | CDS | Fil | EY | n | Updating drawings | 22:14 |
20:46 | PEM | Robert | LVEA | yes | Viewport checks | 21:26 |
20:51 | VAC | Janos | EX | n | Mech room work | 21:25 |
21:18 | OPS | TJ | LVEA | - | Sweep | 21:26 |
21:19 | FAC | Chris | X-arm | n | Check filters | 22:54 |
22:44 | PEM | Robert | LVEA | yes | Setup tests | 00:06 |
22:46 | SQZ | Sheila, Camilla, Matt | LVEA | yes | SQZ meas at racks | 00:06 |
00:19 | CDS | Dave, Marc | EY | N | Timing card issue fix | 01:19 |