SHIFT SUMMARY:

IFO is in MAINTENANCE and LOCKING_ALS

Locking has been near-impossible due to microseism and oppurtunistic earthquakes.

Essentially been dealing with the same issues the whole shift. IFO alignment is actually quite good since we have caught DRMI over 10 times automatically and very quickly but we end up losing lock due to clear instability as a cause of EQs that are exacerbated by over 1 micron/sec secondary microseism.

3 of this shift's EQs have been over 5.0 and we have lost lock around the arrival of the S or R waves each time, with 2 of those being at TRANSITION_FROM_ETMX, around an hour into acquisition, resulting in the long lock acquisitions we're experiencing. Other than TRANSITION, we've lost lock at or before DRMI with ASC and LSC signals oscillating a lot.

As I type this, we just lost lock for the 3rd time at around LOWNOISE_ESD_ETMX so there is potentially something wrong with this state specifically, despite CPS signals showing noise at the same time as the lockloss. The good news is I haven't been experiencing ALS issues at all this shift.

LOG:

Start Time System Name Location Lazer_Haz Task Time End
19:34 SAF Laser Haz LVEA YES LVEA is laser HAZARD!!! 06:13
15:57 FAC Kim, Nelly EY, EX, FCES n Tech clean 18:40
17:27 CDS Jonathan, Fil, Austin MSR, CER n Move temp switch and camera server 20:10
17:28 VAC Ken EY n Disconnect compressor electrical 19:49
17:35 VAC Travis EX n Compressor work 18:33
17:46 VAC Gerardo, Jordan MY n CP4 check 19:16
17:49 SQZ Sheila, Camilla LVEA YES SQZ table meas. 19:39
18:19 SUS Jason, Ryan S LVEA YES PR3 OpLev recentering at VP 21:05
18:19 SUS Matt, TJ CR n ETMX TFs for rubbing 21:21
18:37 FAC Tyler Opt Lab n Check on lab 19:03
18:39 CDS Erik CER n Check on switch 19:16
18:41 FAC Kim LVEA yes Tech clean 19:51
18:56 VAC Travis Opt Lab n Moving around flow bench 19:03
18:58 PEM Robert LVEA yes Check on potential view ports 19:51
19:04 FAC Tyler Mids n Check on 3IFO 19:25
20:21 VAC Gerardo LVEA yes Checking cable length on top of HAM6 20:50
20:27 CDS Fil EY n Updating drawings 22:14
20:46 PEM Robert LVEA yes Viewport checks 21:26
20:51 VAC Janos EX n Mech room work 21:25
21:18 OPS TJ LVEA - Sweep 21:26
21:19 FAC Chris X-arm n Check filters 22:54
22:44 PEM Robert LVEA yes Setup tests 00:06
22:46 SQZ Sheila, Camilla, Matt LVEA yes SQZ meas at racks 00:06
00:19 CDS Dave, Marc EY N Timing card issue fix 01:19