Reports until 16:38, Wednesday 26 February 2025
H1 General
oli.patane@LIGO.ORG - posted 16:38, Wednesday 26 February 2025 (83072)
Ops Day Shift End

TITLE: 02/27 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 145Mpc
INCOMING OPERATOR: Ryan C
SHIFT SUMMARY:
LOG:

15:30UTC Relocking
    - ISC_LOCK in PREP_FOR_LOCKING; H1_MANAGER had gone into error less than a minute before (15:29 UTC)
    - I ran an initial alignment
    - We got those saturations again during OFFLOAD_DRMI_ASC (ndscope)
    - Lockloss during LOWNOISE_ESD_ETMX due to earthquake coming in
    - Holding in DOWN until earth settles
    - Started another initial alignment
    - Another set of saturations during OFFLOAD_DRMI_ASC - this time we lost lock from them (ndscope2)
    - Saturations again but got through them this time
18:15 NOMINAL_LOW_NOISE
18:20 Observing

21:16 Commissioning to adjust A2L and PRCL FF

21:51 Back to Observing
22:48 Superevent S250226dl
00:13 Superevent S250227e                                                                                                                                                                                                                                                                                                                                               

Start Time System Name Location Lazer_Haz Task Time End
16:13 FAC Nellie OpticsLab n Tech clean 16:28
16:19 FAC Tyler MX, MY n 3IFO 18:19
17:20 FAC Kim MY, MX n Tech clean 20:47
17:29 VAC Janos EY N Parts Inventory 17:44
20:40 FIT Matt XARM n Runnin 21:31
22:49 OPT Jennie, Keita, Siva, Mayank OpticsLab n Unwrapping class A parts (Jennie out 00:10) 00:36
Images attached to this report