Displaying report 1-1 of 1.
Reports until 15:15, Thursday 27 February 2025
H1 General
oli.patane@LIGO.ORG - posted 15:15, Thursday 27 February 2025 (83095)
Ops Day Shift End

TITLE: 02/27 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 150Mpc
INCOMING OPERATOR: Ryan C
SHIFT SUMMARY:  Currrently Observing and have been locked for 5.5 hours. Easy day today, relocking when I came in was hands off, and relocking after the next lockloss was hands off besides requesting an initial alignment and TJ lowering the SRC2 P gain during OFFLOAD_DRMI.
LOG:

15:30UTC Relocking
16:14 NOMINAL_LOW_NOISE    
16:15 Observing

16:31 Commissioning

16:36 Lockloss
    - ran initial alignment
    - glitching during DRMI_LOCKED_CHECK_ASC/OFFLOAD_DRMI - SRC2 P gain lowered from 60 to 40 in script
17:42 NOMINAL_LOW_NOISE
    - Going between NLN and NLN_CAL_MEAS for commissioning activities
20:18 Back to Observing

                                                                                                                                                                                                                                                                                                                                                                                                                        

Start Time System Name Location Lazer_Haz Task Time End
15:41 FAC Nellie OpticsLab n Tech clean 16:21
16:34 ISC Sheila, Matt LVEA y(local) Measuring POPAIR 16:43
17:42 FAC Eric EX (outside) n Replace chiller pump seal 21:53
21:01 FAC Chris XARM n Tumbling weeds 22:01
22:06 FAC Eric EX (outside) n Chiller pump work 22:35
Displaying report 1-1 of 1.