oli.patane@LIGO.ORG - posted 16:35, Monday 07 April 2025 (83796)
Ops Day Shift End

TITLE: 04/07 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:

There was some good vent progress made today, but a good chunk of the day was just working on recovering all systems from last night's power outage.

Vent progress made today:
VAC - 1000 AMU RGA WORK - YBT
HAM1 - Contam Control checks
COREY - HAM1 Pictures
ISC - MC Flashing Peek to confirm MC and PSL PZT aligned
FAC - Clean BSC8 door and area
HAM1 - COAX Cable length measurement (disconnect at component)

Overview of biggest issues caused by the outage:
- Power supply for h1susb123SUS C5 (SUS C5) tripped off (83787)
    - ITMs and BS OSEM counts were all sitting very low around 3000. Power supply was flipped back on without turning coil drivers off, causing it to trip again. OSEM counts returned to normal for ITMX and BS, but ITMY coil driver filter banks for M0, L1, L2 were flashing ROCKER SWITCH DEATH. ROCKER SWITCH DEATH means that all OSEM values for that stage are less than 5.
    - Initially remedied by turning coil drivers and power supply off, then power supply back on and then turning coil drivers back on one at a time.
    - 17:46 ROCKER SWITCH DEATH started flashing again for ITMY. ITMs and BS all taken to SAFE, power supply for SUS C5 swapped. Checked before swapping - power supply was still on and had not tripped.
    - Tried power cycling the satamp - didn't work
    - SatAmp replacement worked
- ISI ITMY corner1 interface chassis power regulator was blown (83781)
    - Swapped with a spare
- Timing error for Corner A fanouts, digital port 13, analog port 14  (83777)
    - Power cycled timing comparator and it came back fine
- Timing error for Master, digital port 8, analog port 9 -
- PSL down due to Beckoff chassis off (83785)

LOG:                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                            

Start Time System Name Location Lazer_Haz Task Time End
14:30 FAC Kim, Nelly EY n Tech clean 15:23
15:26 EE Jeff CER n Checking power supply 15:46
15:41   Camilla CER n Checking on Jeff 15:46
15:44 VAC Travis, Jordan LVEA n BSC8 annulus vent 16:26
15:47   Jeff, Jim CER n Checking racks again 15:58
15:50 FAC Kim, Nelly LVEA n Tech clean 19:51
16:06 PSL RyanS LVEA n Power cycling PSL chassis 16:51
16:09 EE Richard CER n Turning power supply back on 16:09
16:11   Jeff, Richard CER n Cycling coil drivers 16:23
16:20 FAC C+U water tower n Excavating to find leak 18:20
16:29 EE Marc CER n ISI chassis work 16:44
16:46 EE Richard Power supply room n   16:50
16:47 PSL RyanS, Jason LVEA n PSL ion pump power cycling 17:23
16:52 ISC Camilla LVEA n Cleaning IOT2 17:54
16:58 VAC Travis, Jordan LVEA n Prep for RGA install,  includes craning 19:04
16:59 AOS Corey LVEA n Photos + contamination control 18:33
17:07 EE Jeff, Marc CER n Power cycling timing comparator 17:21
17:17 EPO Betsy LVEA N Helping Corey 18:17
16:40 FAC Tony, Randy LVEA n Breaking BSC8 bolts 17:23
17:31 FAC Chris EY, EX n FAMIS tasks 18:38
17:45 EE Jeff, Marc CER n Replacing SUS C5 power supply 18:40
17:47 ISI Jim Ends n Restoring HEPI and checking BRS lasers 18:29
18:00 CDS Tony, Erik EX, EY n Dolphin issues, wifi issues 19:04
18:37 SEI Jim HAM8, EY, EX n EY HEPI, EX ISI coil drivers 21:01
18:37 ISC Keita LVEA n HAM1 RF work 19:30
18:40 EE Jeff, Marc CER, LVEA n Power cycling satamp 19:21
18:42 ISC Camilla LVEA n HAM1 RF cables 20:30
18:48   Betsy LVEA n Checking on HAM1 work 20:30
19:01 CDS Jonathan CER n Moving a switch 21:07
19:05 CDS Patrick EX n Beckoff for BRS 19:54
19:44 OPO Corey LVEA N Grab camera equipment by ham1 garb room 19:48
20:13 ISC Keita LVEA N HAM1 RF work cont 20:31
20:29 VAC Jordan, Melina LVEA n RGA work 23:30
20:43 EE Marc & Daniel LVEA N Measure cables HAM1 22:04
21:23 CDS Erik MY, EY, EX n Weather sensor work at MY/EY, HWS work at EY/EX 22:54
21:25 SEI Jim LVEA YES HAM1 HEPI work 23:05
21:26 PSL Keita LVEA n Work on PSL FSS issue 22:10
21:41 PSL Jason, RyanS LVEA n Staring at PSL racks 21:54
21:47   Camilla LVEA YES Transitioning to LASER HAZARD 22:02
21:54 PSL Jason LVEA YES Looking at lockout box 22:02
22:13 (⌐■_■) LVEA IS LASER HAZARD LVEA YES LVEA IS LASER HAZARD 23:24
22:24 ISC Camilla, Betsy, Keita, Elenna LVEA YES Opening lightpipe & opening HAM2 viewport 23:11
22:25 IAS Jason LVEA YES Setting up FARO for tomorrow 22:33
22:50   Richard LVEA YES Checking that people are working safely 23:05
23:06 CDS Erik EY n Fixing dust monitor 23:32
23:13 ISC Camilla LVEA YES Going back to laser safe 23:22