Reports until 16:38, Wednesday 28 May 2025
H1 General
anthony.sanchez@LIGO.ORG - posted 16:38, Wednesday 28 May 2025 (84643)
Wednesday Day ops shift End

TITLE: 05/28 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY:
Epochs of locking:
When I first got in to the control room I ran a full Auto initial alignment.
This lead us to no flashes on DRMI & PRMI.
We then manual initial alignment through a few PRX steps.
Which gave us flashes, but after that we had some noise on the beam splitter oplevs.

Then a REFLAIR phase issue was overcame.
Mean while the SQZrs are turning on the laser and did some aligning on the SQZ tables.
Then unknown 70hz feature was later found out to be ISI in HAM1.

The VAC team checked HAM1 for leeks, and didn't find any.


LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:30 LASER LASER HAZARD LVEA LASER HAZARD LVEA IS LASER HAZARD (\u2310\u25a0_\u25a0) 07:26
14:43 FAC Kim Optics Lab N Technical cleaning 16:21
15:24 VAC Travis & 3 Rogers co Mechanical room N Working purge air system, replacing pump. 20:22
15:34 ISC Sheila & Camilla LVEA Yes touching the Beam splitter Opical lever 16:54
15:41 ISC Betsy LVEA Yes helping Sheila & Camilla 16:54
16:19 VAC Gerardo & Jordan LVEA HAM1 yes Annulus check and spinning valve, May trip HAM1 18:19
16:20 FAC Kim MX & MY N Cleaning Busy Bees 18:17
16:50 SQZ Camilla, Julia, Gorgia, Kevin, Carline LVEA SQZt7 Yes SQZ Tour & work caroline out early 19:14
16:51 ISC ELenna Control Rm N Centering loops on RMs 18:46
17:16 EE Fil LVEA n Swapping chassis. 17:16
17:17 EE Marc LVEA N Visual inspection of sensors. 17:27
18:01 VAC Gerardo LVEA Y Talking to SQZrs 18:41
18:02 FAC Kim HAM Shaq N Technical cleaning 18:46
19:12 SUS Betsy Optics Lab n Getting parts. 19:34
19:22 PCAL Tony, Caroline PCAL Lab Local Setting up K1 meajurement 19:58
19:31 PSL Sheila LVEA Y Plug in 785 20:05
20:23 EE Daniel LVEA HAM1 Y checking on things 20:49
20:40 VAC Gerardo & Jordan & Travis LVEA HAM1 y Jumping on HAM 1 checking for leaks. Travis out early 22:29
20:51 ISC Sheila & Ryam Short LVEA y Pluggin in an SR 785 & adjusting the BS Oplev 22:17
21:40 SQZ Camilla Kevin LVEA SQZTs Y Working on homodyne system, Camilla Out early 23:40
22:26 SQZ Vickie LVEA SQZts y Helping with SQZ work 23:56

 