Reports until 13:40, Thursday 29 May 2025
LHO General
thomas.shaffer@LIGO.ORG - posted 13:40, Thursday 29 May 2025 (84653)
Ops Day Shift End

TITLE: 05/29 Day Shift: 1430-2045 UTC (0730-1345 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY: The morning was spent trying to get back to PREP_ASC_FOR_FULL_IFO as it was found this morning. Locking DRMI was proving to be tricky even though camera flashes looked good and the POP 18&90 flashes also looked good. I would wait 5-10min, make minor adjustments to BS, PRM, or PR2 and try to increase the frequency or magnitude of the flashes. Sometimes this worked, sometimes it wasn't needed, and sometimes we gave up and ran an initial alignment skipping green. We've ran 3 initial alignments so far. We are now sitting at PREP_ASC_FOR_FULL_IFO and control room users are rephasing POP, tuning loops, and checking on other loops. I've had to touch up POP90 &18 at this state with SRM, as long as PRC2 is on to follow. I've also been turning on the RF violin mode damping whenever we sit in this state to help reduce teh high violins that we currently have.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:30 LASER LASER HAZARD LVEA LASER HAZARD LVEA IS LASER HAZARD (\u2310\u25a0_\u25a0) 07:26
14:51 SEI Randy, Mitchell EX n Wind fence work 18:51
15:42 VAC Rodgers, Ken Mech room n Compressor work 19:42
17:17 VAC Gerardo LVEA yes HAM1 AIP tapping 18:13
17:50 SQZ Vicky, Kevin, Georgia LVEA yes Plugging in cable 18:29