Reports until 16:32, Monday 23 June 2025
H1 General
oli.patane@LIGO.ORG - posted 16:32, Monday 23 June 2025 (85262)
Ops Day Shift End

TITLE: 06/23 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 148Mpc
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY: Currently Observing at 150Mpc and have been Locked for just over 2 hours. Nothing too out of the ordinary today. We had two locklosses, but relocking was relatively straightforward.
LOG:

14:30 Observing at 140Mpc and have been locked for 11 hours
14:54 Out of Observing due to SQZ unlock
15:00 Staying out of Observing to start Commissioning - went to FIS

17:18 Lockloss (85239)
    - Holding in DOWN for a bit while VAC team closes the pump valve for HAM1
    - Running an initial alignment (accidentally did it before the newly mandated 30-60 BS cooling period but it went okay)
18:52 NOMINAL_LOW_NOISE
19:58 Lockloss (85249)
21:23 NOMINAL_LOW_NOISE
21:25 Observing 

Start Time System Name Location Lazer_Haz Task Time End
14:41 FAC Nellie MY n Tech clean 15:29
14:55 FAC Kim MX n Tech clean 15:49
16:13 PCAL Tony PCAL Lab y(local) Packing up PCAL stuff 17:06
16:52 ISC Sheila LVEA n Plugging in a cable (in 10 mins ago) 16:52
17:21 VAC Jordan, Travis LVEA n Closing out pump valve 17:29
20:21 ISC Keita OpticsLab y(local) ISS array 21:37
20:26 FAC Tyler MX n Bees 20:41
21:09   Mitchell, Jason MY n Verifying some stuff 22:20