Displaying report 1-1 of 1.
Reports until 12:19, Wednesday 25 June 2025
H1 SQZ
camilla.compton@LIGO.ORG - posted 12:19, Wednesday 25 June 2025 - last comment - 14:27, Wednesday 25 June 2025(85329)
SQZ HD Dataset

Yesterday 85295 we took HD data just at the nominal 95uW OPO trans setpoint, today we changed the NLG and retook data, saved at /camilla.compton/Documents/sqz/templates/dtt/20250625_HD.xml

Strangely, when I started checking the NLG with 95uW, once the seed was injected, this dropped to 65uW, I then increased injected seed power form 0.5mW to 0.6mW, I also  increased the pump power as we were close to the edge of the AOM range.

Used SQZ_MANAGER SQZ_READY_HD (needed to change LO gain, see sdf).

Type NLG Angle SQZ (@500Hz) DTT Ref
LO shot noise N/A N/A Used as 0dB ref 1
ASQZ 10 (+) 206 14.3dB ref 2
SQZ 10 (-) 112 6.9dB ref 3
Mean SQZ 10 N/A 11.3dB ref 4
ASQZ 18 (+) 210 17.2dB ref 5
SQZ 18 (-) 112 7.3dB ref 6
Mean SQZ 18 N/A 14.1dB ref 7
ASQZ 21 (+) 210 17.5dB ref 8
SQZ 21 (-) 110 7.4dB ref 9
Mean SQZ 21 N/A 14.7dB ref 10
ASQZ 14 (+) 206 15.6dB ref 11
SQZ 14 (-) 113 7.4dB ref 12
Mean SQZ 14 N/A 12.7dB ref 13
 
OPO Setpoint Amplified Max Amplified Min UnAmp Dark NLG OPO Gain
95uW 0.0730506 0.002413 0.006841 8.4e-5 10.81 -8
115uW 0.122166 0.002215     18.08 -8
120uW 0.141799 0.0021763     20.99 -8
105uW 0.0942627 0.0023351     13.95 -8
Comments related to this report
camilla.compton@LIGO.ORG - 12:28, Wednesday 25 June 2025 (85331)

Plot attached, we think that the SQZ is worse at NLG 10 that the other NLGs and we are considering running with NLG = 14.

Images attached to this comment
sheila.dwyer@LIGO.ORG - 12:52, Wednesday 25 June 2025 (85332)

Here's a fit of Camilla's data, it shows that our OPO threshold has increased compared to 83070, and we still have the same efficiency for squeezing, which implies 6% unexplained loss, which hasn't been fixed by moving the crystal. 

This plot was made using this script

Images attached to this comment
camilla.compton@LIGO.ORG - 14:27, Wednesday 25 June 2025 (85337)OpsInfo

We decided that an OPO TRANS setpoint of 105uW for an NLG of 14 gave us slightly better squeezing, see attached BLRMS. Leaving this in.

If the Operators have any issues keeping the OPO locked at this higher output power, they could lower it slightly following the instructions in 70050 to drop it down to 100uW or 95uW.

Images attached to this comment
Displaying report 1-1 of 1.