TITLE: 06/30 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Tony
SHIFT SUMMARY: We've had to relock twice, the second time we struggled a bit with DRMI. We're currently locked at NLN but trying to fix a SQZ SHG PZT issue.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
14:50 | FAC | Randy | EndX | N | Chiller yard pump checks | 16:01 |
15:13 | FAC | Kim | MidY | MidY | Tech clean | 16:20 |
15:14 | FAC | Nellie | MidX | N | Tech clean | 16:20 |
16:24 | EE | Ken | Mezz | N | Electrical work | 18:56 |
16:49 | FAC | Chris | VAC Prep | N | Sanding | 17:39 |
19:34 | FAC | Randy | MidY | N | Inventory | 20:30 |
20:06 | FAC | Tyler | Mids | N | FAMIS checks | 20:36 |
22:39 | CAL | Tony | PCAL lab | LOCAL | Prep for tomorrows measurement | 22:58 |