Reports until 16:36, Monday 30 June 2025
H1 General
ryan.crouch@LIGO.ORG - posted 16:36, Monday 30 June 2025 (85437)
OPS Monday day shift start

TITLE: 06/30 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Tony
SHIFT SUMMARY: We've had to relock twice, the second time we struggled a bit with DRMI. We're currently locked at NLN but trying to fix a SQZ SHG PZT issue.
LOG:                                                                                                                                 

Start Time System Name Location Lazer_Haz Task Time End
14:50 FAC Randy EndX N Chiller yard pump checks 16:01
15:13 FAC Kim MidY MidY Tech clean 16:20
15:14 FAC Nellie MidX N Tech clean 16:20
16:24 EE Ken Mezz N Electrical work 18:56
16:49 FAC Chris VAC Prep N Sanding 17:39
19:34 FAC Randy MidY N Inventory 20:30
20:06 FAC Tyler Mids N FAMIS checks 20:36
22:39 CAL Tony PCAL lab LOCAL Prep for tomorrows measurement 22:58