TITLE: 07/07 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 138Mpc
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY:
I had to run an Initial alignment twice this morning before H1 would get past DRMI and Evetually reached NLN at 16:41:30 UTC.
@ 14:07 UTC Unknown Lockloss today.
Relock needed another Initial Alignment to get past DRMI. We eventually Arrived back at NLN at 19:26 UTC.
@21:01 UTC I noticed the Range drop and I started to Troubleshoot Range Related SQZ issues.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
16:18 | PEM | Robert | LVEA +X | N | Turning on Current Clamp | 16:22 |
18:20 | PEM | Robert | LVEA HAM 1 | N | More PEM commisioning. | 19:06 |
19:11 | PEM | Robert | LVEA | N | Shutting down PEM amps | 19:13 |