Reports until 17:05, Monday 07 July 2025
H1 General
anthony.sanchez@LIGO.ORG - posted 17:05, Monday 07 July 2025 (85594)
Day shift report

TITLE: 07/07 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY:

Relocking notes:
Today started off with an Initial_Alignment that was interrupted by earthquake mode being reactivated.
Which prompted another Inital_Alignment.
While trying to relock there was many attempts at the  DRMI-> PRMI-> Check_Mich_Fringes which yeilded no locking results.
Another Initial Alignment happened, Which allowed us to lock DRMI but we caught a lockloss at LOW_NOISE_COIL_DRIVERS, and on the next attempt OMC_WHITENING.

After that H1 Bouced around through DRMI-> PRMI-> and Check_Mich _Fridges again until another Inital_Alignment was ran.

We finally got back to NLN at 20:54 UTC and were locked for a little over 2 hours before the 4pm Lockloss struck.


LOG:                                                                           

Start Time System Name Location Lazer_Haz Task Time End
15:31 SQZ Matt & Sheila SQZT0 Local Adjusting the OPO Crystal 18:25
15:38 FAC Kim & Nelly MX & MY N Kim, Technical Cleaning at MX, Nelly MY. 16:41
16:28 PEM Sam & Robert LVEA HAM1 & 2 N Installing Accerometer 17:28
20:32 PEM Robert LVEA N Turning off PEM apparatuses 20:34
20:48 ISS Rahul Optics Lab Local Working in Optics lab, Likely on ISS 20:53
21:47 VAC Jordan Mx N Getting rack 22:17