Reports until 17:13, Wednesday 09 July 2025
H1 PSL (ISC, PSL)
keita.kawabe@LIGO.ORG - posted 17:13, Wednesday 09 July 2025 - last comment - 11:10, Thursday 10 July 2025(85659)
Summary of all ISS PD Array units that are not in use as of now (Randy, Rahul, Jennie, Keita)

Randy moved the 3IFO ISS PD array (S1202968) crate from MY storage to the OSB yesterday (WP). I opened the crate, moved the transport/storage container to the vacuum lab and optics lab to inspect. It was in a good shape except that some upgrade parts weren't there. Since I'm already forgetting what happened to other units, here's the summary.

First about parts.

Next, the summary per unit.

Here's the thing about the PD array plate D1300322 (see attached). The updated version has a wider 100deg conical bore for larger beam clearance because it was found at some point (ECR E1400231) that the clearance was too small for the original bore and the reflection of some PDs will hit the bore wall at an glazing angle instead of hitting the beam dump. It's also easy to imagine that if you fiddle with the alignment for the production unit in chamber, INPUT light on some PDs will hit the bore wall first before hitting the PD surface.

Images attached to this report
Comments related to this report
jennifer.wright@LIGO.ORG - 11:10, Thursday 10 July 2025 (85671)

We have the blue glass beam dumps for the S1202966 unit, they just need cleaned - location  is sitting on top of the unit in the Optics lab.