Test for Thursday morning at 7.45 am, assuming we are thermalised.
- In NLN.
- Turn off OMC ASC:
- sitemap -> OMC -> OMC Control -> turn MASTER GAIN slider to 0 (its blue and on the bottom centre of screen).
- Run DARM offset step:
- Go to /ligo/gitcommon/labtutils/darm_offset_step
- run:
conda activate labutils
python auto_darm_offset_step.py
Wait until program has finished ~20 mins.
Turn OMC ASC back on by putting master gain slider back to 0.020.
- Heat up OM2 heater (~ 3 hours):
- IFO out -> OM2 -> change H1:AWC-OM2_TSAMS_POWER_SET value to 4.6.
- After power has leveled out on H1:AWC-OM2_TSAMS_THERMISTOR_1_TEMPERATURE and H1:AWC-OM2_TSAMS_THERMISTOR_2_TEMPERATURE, turn off OMC ASC again by putting MASTER GAIN slider back to 0 on OMC Control screen.
- Run auto_darm_offset_step.py again.
- Put OM2 heater H1:AWC-OM2_TSAMS_POWER_SET back to 0.
- Test done, wait for thermistors to level out again.
Test for Thursday morning at 7.45 am, assuming we are thermalised, rewrote instructions above and took out last part.
conda activate labutils
python auto_darm_offset_step.py
Wait until program has finished ~15 mins.
Turn OMC ASC back on by putting master gain slider back to 0.020.
Commissioners will turn off OMC ASC and close beam diverter once heating has finished then do DARM offset step and other tests before turning on ASC and opening beam diverter before cooling down OM2 again.