After engaging full IFO ASC and soft loops this afternoon, I updated the ITM camera and ALS QPD offsets and accepted them in the appropriate SAFE SDF tables. After Beckhoff reboots and PSL optic inspections, we'll run an initial alignment to solidify these alignment setpoints. They will need to be accepted in the OBSERVE tables once eventually back to NLN.