Green Alignment References Updated

After engaging full IFO ASC and soft loops this afternoon, I updated the ITM camera and ALS QPD offsets and accepted them in the appropriate SAFE SDF tables. After Beckhoff reboots and PSL optic inspections, we'll run an initial alignment to solidify these alignment setpoints. They will need to be accepted in the OBSERVE tables once eventually back to NLN.

Images attached to this report
Comments related to this report
elenna.capote@LIGO.ORG - 15:57, Monday 15 September 2025 (86944)

I checked the POP A offsets when the alignment converged and updated them.