TITLE: 09/15 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: Ibrahim
SHIFT SUMMARY: More progress today towards recovering H1 back to low noise! We've been able to make it up to LASER_NOISE_SUPPRESSION once so far and updated alignment offsets. Unfortunately we did see the slow increase of IMC REFL again once increasing the input power to 63W during LNS, and shortly after there was an IMC-looking lockloss. Since then, Jason and Keita inspected optics in the PSL and didn't find anything alarming. We attempted to reproduce the IMC REFL behavior with just the IMC locked up to 63W with the ISS secondloop on and off, but did not see it, interestingly. We then decided to try locking again, so an initial alignment with the new green offsets is ongoing.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
15:47 | FAC | Nellie | MY | N | Technical cleaning | 16:40 |
16:40 | FAC | Kim | MX | N | Technical cleaning | 17:31 |
16:41 | FAC | Randy | MY | N | 18:25 | |
16:44 | ISC | Elenna | LVEA | N | Plugging in freq injection cable | 16:49 |
17:49 | FAC | Kim | H2 | N | Technical cleaning | 18:00 |
21:15 | PEM | TJ | EY | N | Checking DM vacuum pump | 22:13 |
21:16 | PSL | Jason, Keita | PSL Encl | Local | Optics inspection | 23:11 |
21:25 | VAC | Gerardo | LVEA | N | Check HAM6 pump | 21:33 |
21:37 | VAC | Gerardo | MX | N | Inspect insulation | 23:12 |
21:40 | CDS | Erik, Fil | LVEA/CER | N | Checking RF chassis | 22:13 |