TITLE: 10/04 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 150Mpc
INCOMING OPERATOR: Tony
SHIFT SUMMARY: H1 remained lock the whole day with only a few drops from observing, most of which were intentional. After the squeezer relocked, the range was a bit low, but the SQZ angle servo eventaully brought it back up over the course of about an hour. I probably could have run a SQZ angle scan right before going back into observing to fix the range sooner. H1 has now been locked for 27 hours.
LOG:
This SQZ Lockloss was caused by the OPO PZT running out of range. Plot attached, when the OPO relocked with the PZT at ~100V, the SQZ angle servo worked as expected to bring the range back.