H1 General
ryan.crouch@LIGO.ORG - posted 22:00, Tuesday 07 October 2025 - last comment - 11:03, Wednesday 08 October 2025(87364)
OPS Tuesday EVE shift summary

TITLE: 10/08 Eve Shift: 2330-0500 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Observing at 155Mpc
INCOMING OPERATOR: TJ
SHIFT SUMMARY: We stayed locked the whole shift, just over 7 hours. PEM-MAG-INJ has a CFC.
LOG:                                                                                                                                                                                                                                                                                                                                                              

Start Time System Name Location Lazer_Haz Task Time End
22:52 SAF Laser HAZARD LVEA YES LVEA is Laser HAZARD \u0d26\u0d4d\u0d26\u0d3f(\u239a_\u239a) 13:52
23:52 PSL Jennie, Rahul Optics lab LOCAL ISS Array work, in at 23:00 00:18
Comments related to this report
corey.gray@LIGO.ORG - 11:03, Wednesday 08 October 2025 (87367)

Gosh---I thought I posted my Day shift Summary, but obviously did not---posting it here:


TITLE: 10/07 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Ryan C
SHIFT SUMMARY:

Mostly straightforward Maintenace with all activity below.  The shift ended with some SQZ locking trouble, but after an hour of working this issue, H1 was back to Observing.
LOG:

  • 1430-1807 Xarm BTE inspections from corner to MX all day (randy)
  • 1439 reboot FOMs (eric)
  • 1440 PAUSE on ITMx/y CO2 PWR Guardians for Camilla and Matt T meas
  • 1447-1525 Kim & Dawn walkthru LVEA @8am PDT
  • 1452-1520 disassembly of blue  A-Frame gantry (chris, eric)
  • 1452-1551 EY cleaning (nellie)
    • 1529 EX cleaning (kim.dawn)
    • 1613-1723 LVEA cleaning (nellie)
    • 1646-1723 LVEA cleaning (kim)
    • 1756-1831 FCES cleaning (nellie,kim)
  • 1500 Maintenance Begins!
  • 1500 OMC Scans (mattT)
    • 1518 psl rack visit (MattT)
  • 1517 Site travels for safety/3ifo/periodic checks (tyler)
  • 1520 SR3/PR3 models updated (dave)----Related to upcoming SR3/PR3 work by Jeff/Oli
  • 1524-1612 FCES hvac (eric)
  • 1530-1841 EX Air Handler (AHU bearing replacement (chris)
    • 1611-1841 eric joining
  • 1533-1653 LN2 Norco truck arrives for MY (cp3)
    • 1555-1735 LN2 Norco truck arrives, but goes down X-arm (from trello thought they would be EY CP7)....3min later, I saw them backing up---assuming going to EY!
  • 1534-1620 floor measurements & parts (betsy)
    • 1648-1730 Heading back out (betsy)
  • 1548-1558 CO2x TCS laser needing to be turned back on (camilla, sheila, matt)
  • 1553-1836 MY & MX emergency/roughing pump work (travis)
    • 1624-1836 Janos joining
  • 1607-1628 Laser test set-up in Optics Lab (jason)
  • 1608-1622 HAM4 ISI off for 20min (jim.marc)
  • 1608-1632 Checking (JAC?) parts (daniel)
    • 1617-1632 Jenny joining
    • 1656-1712 Back out to get mechanical shutter (daniel)
  • 1637-1733 Various PSL tweak ups (jason, ryan)
  • 1659-1739 HAM6 HEPI sensor work [ISI to DAMPED] (jim)
  • ~1700-1921 PR3/SR3 work begins (jeff, oli, dave)
    • 1714 Restarts complete (dave)
  • 1711-1811 Check new SUS rack in lvea (marc)
  • 1713-1827 ISS PD Array/laser HAZARD (keita)
    • 1753-1827 rahul joining
    • 2156 Keita returning & 2234 Rahul/Jenny returning
  • 1715 HAM7 WD trip (jim said it wasn't him), and reisolated
  • 1718-2009 moving vertex (bsc1/2/3) accelerometers in/out of LVEA a few trips (robert)
  • 1743 new-NPRO characterization in optics lab (jason.ryan)
    • 2024-2113 Out for lunch
  • 1753-1800 leave parts grab (corey)
  • 1753-1822 checking isc drawers (jenny)
  • 1809-1919 VEA CDS laptops search & update (tony)
  • 1810-1852 Swap sled on Hartman table (camilla, tj)
  • 1852-1858 TJ Sweeping LVEA
  • 1921-1945 Initial Alignment started
  • 1937 Delivery truck pulls up to Gate (I mentioned signs point to LSB for deliveries, but they said they did not see a sign).  Steered truck back to LSB Receiving.
  • 1947 Locking begins
    • 2029 Lockloss at LOWNOISE ASC (it was determined this was caused from some Guardian changes from Maintenance---Elenna found the issue and updated Guardian for the next lock).
    • Next lock had horrible DRMI alignment, tried PRMI +tweaks with not much luck, so ran a Check Mich Fringes + PRMI and eventually locked PRMI at 2057; DRMI finally locked at 2112 (but I did tweak the SRM after waiting 10min!)
    • 2151 Back to NLN, BUT the SQZ was not Squeezing.  Roughly an hour later with alot of help from Oli & Tony, we were able to lock the SQZ and go back to Observing.
      • (will alog specifics for this later) 
  • 2045 Cassidy had a class tour in the Control Room