TITLE: 10/13 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 150Mpc
INCOMING OPERATOR: Ibrahim
SHIFT SUMMARY: Locked for 4 hours. We had one lock loss during commissioning time today, though it does not seem to be caused by any commissioning activites. useism is on its way up, and the wind is gusting above 30mph at times.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
22:52 | SAF | Laser HAZARD | LVEA | YES | LVEA is Laser HAZARD | 13:52 |
14:36 | FAC | Randy | Yarm | n | Y arm bte checks | 18:36 |
14:46 | FAC | Kim | Opt Lab | n | Tech clean | 15:10 |
14:59 | FAC | Nelly | MY | n | Tech clean | 15:50 |
15:11 | FAC | Kim | MX | n | Tech clean | 16:05 |
15:33 | ISC | Matt | Prep lab | n | Cheeta table prep | 15:46 |
16:38 | FAC | Kim | Prep lab | n | Table clean | 17:09 |
16:50 | ISC | Keita | Opt Lab | YES | ISS array work | 20:54 |
17:01 | SYS | Mitchell | MY | n | Checking out equipment | 17:49 |
17:56 | ISC | Matt | Prep lab | n | More measurements | 18:13 |
18:03 | VAC | Janos | EY, EX | n | Parts locate | 18:33 |
18:07 | FAC | Tyler | Xarm | n | Checkng on X1 bte | 18:37 |
20:21 | VAC | Travis | Mids | n | Measurement and prep for tomorrow | 20:50 |
20:54 | ISC | Rahul, Jennie | Opt Lab | YES | ISS array work | 23:08 |