TITLE: 10/14 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 153Mpc
INCOMING OPERATOR: Oli
SHIFT SUMMARY: We ran into some issues after relocking following maintenance, but everything is stable currently. Is it in the best setup/orientation? Maybe not.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
22:52 | SAF | Laser HAZARD | LVEA | YES | LVEA is Laser HAZARD \u0d26\u0d4d\u0d26\u0d3f(\u239a_\u239a) | 15:51 |
14:34 | FAC | Eric | Mech room | N | FAC checks | 14:55 |
14:35 | FAC | Randy | Yarm | N | Beam tube inspection, midy to corner | 18:39 |
15:08 | SUS | Jeff | CR | N | ETMX measurements, prep for satamp swap | 16:08 |
15:08 | SUS | Matt | CR | N | ITM measurements | 15:25 |
15:12 | TCS | Matt | LVEA | Y | Turn off sidebands | 15:25 |
15:18 | FAC | Chris | Out buildings | N | FAMIS checks | 16:59 |
15:24 | FAC | Kim | EndX | N | Tech clean | 16:39 |
15:24 | FAC | Nellie | EndX | N | Tech clean | 16:38 |
15:25 | VAC | Gerardo, Jordan | EY | N | Purge air | 17:15 |
15:28 | FAC | Tyler | Yarm | N | Termination slab checks | 19:04 |
15:31 | EE | Fil | CER | Y | ITM work | 16:11 |
15:35 | OPS | RyanS | LVEA | Y -> N | HAZARD TRANSITION, to safe | 15:51 |
16:04 | FAC | Richard | LVEA | N | Safety checks | 16:25 |
16:05 | VAC | Anna | LVEA | N | Join RGA team | 17:15 |
16:06 | VAC | Travis | MidX | N | Emergency pump checks | 17:11 |
16:13 | SUS | Jeff | CR | N | ETMY measurement | 16:51 |
16:14 | EE | Fil | Ends, X -> Y | N | Satamp swap, EY at 16:38 UTC | 17:22 |
16:32 | ISC | Sam | LVEA | N | Measure stuff | 17:13 |
16:33 | Keita, Alicia, Joan-Rene | LVEA | N | Tour, take pictures | 17:14 | |
16:42 | PSL | Rahul, Jennie | Optics lab | LOCAL | ISS PD array | 18:23 |
16:43 | FAC | Nellie, Kim | LVEA | N | Tech clean | 18:21 |
16:51 | SUS | Jeff | LVEA | N | ITMX SAT amp measurement | 17:03 |
17:00 | FAC | Chris | LVEA | N | FAMIS checks | 17:25 |
17:22 | EE | Marc, Fil | LVEA HAM5 | N | SUS R7 rack work, chassis installations | 18:59 |
17:04 | SUS | Jeff | LVEA | N | SR75 measurement in the Biergarten ITMX | 18:05 |
17:11 | VAC | Travis | MidY | N | Emergency pump checks | 17:42 |
17:31 | FAC | Richard, Alicia, Joan-Rene | OSB roof | N | Admire the view | 17:47 |
17:33 | VAC | Janos, Anna | LVEA | N | Move parts | 18:01 |
17:35 | VAC | Jordan | LVEA | N | 1000 amu RGA | 18:01 |
17:48 | IMC | Matt | CR | N | IMC injections | 17:54 |
17:56 | IMC | Matt | LVEA | N | Sidebands back on | 17:58 |
18:00 | TCS | Matt | LVEA | N | Turn back on TCS Y | 18:10 |
18:27 | VAC | Jordan, Anna | LVEA | N | YARM manifold rga | 19:02 |
19:00 | TCS | Matt | LVEA | N | Reset both CO2 lasers | 19:04 |
19:03 | OPS | RyanS | LVEA | N | LVEA sweep | 19:14 |
19:24 | ASC | Elenna | CR | N | Soft ASC loops measurement | 21:06 |
19:49 | PSL | Rahul, Keita | Optics lab | N | ISS Array work, laser safe | 21:46 |
19:50 | FAC | Randy | Yarm beamtube | N | Beamtube inspection | 21:46 |
20:42 | EE | Fil | MidY | N | Grab electronics parts | 21:42 |
21:56 | Matt | Vac prep lab | N | Grab a part | 22:06 | |
21:56 | PSL | Jennie | Optics lab | N | Double check something | 22:11 |