Reports until 16:36, Tuesday 21 October 2025
H1 General
oli.patane@LIGO.ORG - posted 16:36, Tuesday 21 October 2025 (87626)
Ops Day Shift End

TITLE: 10/21 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
INCOMING OPERATOR: Ryan C
SHIFT SUMMARY: Currently trying to relocking. Having some trouble, partially due to extremely high secondary microseism, and partly due to unknown issues.
LOG: 

14:30UTC Detector in IDLE due to high secondary microseism
20:47 Start relocking
    20:47 Initial alignment
    21:25 Initial alignment done
    Lockloss from LOWNOISE_LENGTH_CONTROL - ringup started when gains were changed, lost lock 10s later                                                                                                                                                                                                                                                                                                                                                                                    

Start Time System Name Location Lazer_Haz Task Time End
15:06 FAC Eric EX, EY n Lubricating fans 16:06
15:08 VAC Gerardo EX n Ion pump 15:44
15:09 VAC Jordan MY, EY n Turbo pump tests 18:35
15:15 FAC Kim, Nellie HAM Shack n Tech clean 16:08
15:19 FAC Tyler EX n Joining Eric 16:06
15:45 EE Fil LVEA n Swapping MC lower stage satamps 17:23
15:46 FAC Randy LVEA n Inspections 16:06
16:05 FAC Mitchell LVEA n Moving stuff to SEI rack 16:12
16:08 FAC Kim, Nellie LVEA n Tech clean 17:35
16:58 FAC Tyler LVEA, MX, MY n 3IFO checks 18:43
17:00 EE Marc LVEA n Joining Fil 17:06
17:08 SEI Jim, Randy LVEA n Looking around BSC2 17:59
17:24   Keita, Rahul OpticsLab y(local) ISS Array 19:48
17:31 EE Fil EX, EY n Checking out fibers and figuring out power supply issue 19:21
17:35 SEI Jim LVEA n Working on HAM7 SEI satamps 17:59
17:35 FAC Nellie EY n Tech clean 18:33
17:36 FAC Kim EX n Tech clean 19:23
17:36 EE Marc EX n Replacing failed fan 18:41
17:46 FAC Randy EY, EX n Checks 19:37
18:45 EE Marc EX n Get ready to restart EX pump controller 19:45
19:30 VAC Gerardo EY n Turning off purge air pumps 20:26
19:37 FAC Randy XTube n Caulking the tube 21:59
20:03   RyanC LVEA n Sweeping 20:26
21:49 EE Marc, Fil MY n Investigating PEM power supply failure 22:11
22:43 PSL Keita Optics lab lOCAL ISS array 23:43
23:03 EE Marc, Fil MY n Replacing power supply 23:23