Reports until 17:21, Wednesday 22 October 2025
H1 General
oli.patane@LIGO.ORG - posted 17:21, Wednesday 22 October 2025 (87663)
Ops Day Shift End

TITLE: 10/23 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: Ryan C
SHIFT SUMMARY: Currently relocking and at LOWNOISE_COIL_DRIVERS. Still struggling with a 1 Hz oscillation(87658), but we've solved issues with MICH phase margin and with a 0.6 Hz oscillation caused by incorrect estimator settings, so 2/3 of the issues solved?
LOG:

14:30UTC Started relocking
    Initial alignment
    Lockloss from OMC_WHITENING due to 1 Hz ringup
    Multiple locklosses from DRMI and under due to ALSX getting noisy and ALSY having some glitchy drops in power
    Locklosses from LOWNOISE_LENGTH_CONTROL, MOVE_SPOTS, etc.                                                                                                                                                                

Start Time System Name Location Lazer_Haz Task Time End
15:45   Matt JOAT n Putting stuff away 15:50
15:49 FAC Kim OptLab n Tech clean 16:10
16:48 FAC Randy XTube n Caulking more tube 20:40
17:26   Tony CER n Putting laptop away 17:31
20:18 VAC Travis MX, MY n Taking measurements 23:43
20:18   Keita OptLab y(local) ISS Array 21:44
20:39 FAC Randy Yarm n More Caulking of the BTE, starting at EY 22:08
20:40 IO Rahul Opt Lab y(local) ISS array 21:44
20:58 SEI/CC Jim, Mitch Ends n Wind fence, HEPI, and dust mon pump FAMISs 00:27
21:17   Tyler, Shinji OptLab y(local) Meeting with Keita 21:44
21:47   Jenne, +PAC Roof n Overlooking the arms 22:08
22:38 PCAL Tony PCAL Lab y(local) Setting up measurement 22:38