TITLE: 10/24 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: Ryan C
SHIFT SUMMARY: Busy day of continuous troubleshooting of H1. Things have been learned and progress has been made, but currently still waiting to relock after discovering an incorrect whitening setting and swapping a sat amp to see if those help with some of our instabilities. We've had some locklosses at DRMI_3F, but waiting for DRMI ASC to fully converge on this most recent try seemed to work. Currently relocking up to MOVE_SPOTS.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 14:32 | FAC | Randy | Y-arm | N | Caulking BTE | 17:17 |
| 17:03 | VAC | Travis | MX, MY | N | Checking pumps | 17:34 |
| 17:20 | FAC | Randy | CS, EX | N | Moving boom lift to EX | 17:48 |
| 17:44 | ISC | Keita, Rahul | Opt Lab | Local | ISS array work | 18:43 |
| 20:27 | VAC | Travis | MY | N | Pump measurement | 20:43 |