Reports until 16:53, Friday 24 October 2025
LHO General
ryan.short@LIGO.ORG - posted 16:53, Friday 24 October 2025 (87731)
Ops Day Shift Summary

TITLE: 10/24 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: Ryan C
SHIFT SUMMARY: Busy day of continuous troubleshooting of H1. Things have been learned and progress has been made, but currently still waiting to relock after discovering an incorrect whitening setting and swapping a sat amp to see if those help with some of our instabilities. We've had some locklosses at DRMI_3F, but waiting for DRMI ASC to fully converge on this most recent try seemed to work. Currently relocking up to MOVE_SPOTS.

LOG:

Start Time System Name Location Lazer_Haz Task Time End
14:32 FAC Randy Y-arm N Caulking BTE 17:17
17:03 VAC Travis MX, MY N Checking pumps 17:34
17:20 FAC Randy CS, EX N Moving boom lift to EX 17:48
17:44 ISC Keita, Rahul Opt Lab Local ISS array work 18:43
20:27 VAC Travis MY N Pump measurement 20:43