TITLE: 11/05 Eve Shift: 0030-0600 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
OUTGOING OPERATOR: TJ
CURRENT ENVIRONMENT:
SEI_ENV state: EARTHQUAKE
Wind: 10mph Gusts, 6mph 3min avg
Primary useism: 0.52 μm/s
Secondary useism: 0.35 μm/s
QUICK SUMMARY:
Maintenance Day Recovery continues through the hand-off, but H1 locking is also being impacted by strong seismic activity (Russia EQs + microseism also inching back up). Violins look elevated as well, so there has been attention given to them.
Hand-Offs from TJ: