TITLE: 11/06 Eve Shift: 0030-0600 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Observing at 19Mpc
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY:
H1 was locked the entire shift. There was one quick drop due to an "automatic" PMC Voltage adjustment. Microseism is still high and mostly stable at same level for the last 20hrs.
LOG: