Displaying report 1-1 of 1.
Reports until 07:42, Thursday 06 November 2025
LHO General
ibrahim.abouelfettouh@LIGO.ORG - posted 07:42, Thursday 06 November 2025 (87987)
OPS Day Shift Start

TITLE: 11/06 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Lock Acquisition
OUTGOING OPERATOR: Ryan S
CURRENT ENVIRONMENT:
    SEI_ENV state: USEISM
    Wind: 26mph Gusts, 19mph 3min avg
    Primary useism: 0.06 μm/s
    Secondary useism: 0.46 μm/s 
QUICK SUMMARY:

IFO is LOCKING at LOCKING_ALS

Wind and microseism were high last night and microseism is still quite high and over the 90% threshold. H1 was finishing an automatic initial alignment when I arrived.

Relocking now.

Displaying report 1-1 of 1.