TITLE: 11/07 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Microseism
INCOMING OPERATOR: Corey
SHIFT SUMMARY: Two lock losses this morning, the first from the 1Hz ring up and the second most likely from PEM injections. We haven't been able to get back to low noise since, because the 0.1-1.0Hz seismic motion has risen in the past 6 hours to the point where we can't hold DRMI.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 16:00 | FAC | Randy | Xarm | N | Caulking joints | 19:19 |
| 18:00 | SUS | Betsy | LVEA | N | Pre-LVEA C3 Cover Acquisition | 18:14 |
| 19:19 | FAC | Randy | Yarm | n | BTE sealing on Y2 | 23:13 |
| 19:41 | SYS | Betsy | Opt Lab | n | Poking her head in on things | 20:39 |
| 20:40 | PEM | Robert | LVEA | n | In and out to setup measurements | 23:36 |
| 21:49 | ISC | Keita, Rahul | Opt Lab | Local | Checking setup (Keita out 2239) | 00:27 |
| 22:21 | ISC | Sheila, Kar Meng | Opt lab | LOCAL | OPO spot finding | 23:59 |
| 22:39 | ISC | Sheila, Kar Meng | LVEA | n | Find BS near HAM6 | 23:09 |
| 23:01 | SPI | Corey, Ryan S | Opt Lab | n | Optics cleaning | 00:31 |
| 23:36 | CDS | Dave | H2 Build | n | Testing new DACs | 02:36 |