Reports until 16:33, Thursday 06 November 2025
LHO General
thomas.shaffer@LIGO.ORG - posted 16:33, Thursday 06 November 2025 (87994)
Ops Day Shift End

TITLE: 11/07 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Microseism
INCOMING OPERATOR: Corey
SHIFT SUMMARY: Two lock losses this morning, the first from the 1Hz ring up and the second most likely from PEM injections. We haven't been able to get back to low noise since, because the 0.1-1.0Hz seismic motion has risen in the past 6 hours to the point where we can't hold DRMI. 
LOG:

Start Time System Name Location Lazer_Haz Task Time End
16:00 FAC Randy Xarm N Caulking joints 19:19
18:00 SUS Betsy LVEA N Pre-LVEA C3 Cover Acquisition 18:14
19:19 FAC Randy Yarm n BTE sealing on Y2 23:13
19:41 SYS Betsy Opt Lab n Poking her head in on things 20:39
20:40 PEM Robert LVEA n In and out to setup measurements 23:36
21:49 ISC Keita, Rahul Opt Lab Local Checking setup (Keita out 2239) 00:27
22:21 ISC Sheila, Kar Meng Opt lab LOCAL OPO spot finding 23:59
22:39 ISC Sheila, Kar Meng LVEA n Find BS near HAM6 23:09
23:01 SPI Corey, Ryan S Opt Lab n Optics cleaning 00:31
23:36 CDS Dave H2 Build n Testing new DACs 02:36