Displaying report 1-1 of 1.
Reports until 16:37, Thursday 13 November 2025
H1 General
oli.patane@LIGO.ORG - posted 16:37, Thursday 13 November 2025 (88097)
Ops Day Shift End

TITLE: 11/14 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Microseism
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY: In IDLE and not currently trying to relock due to the high secondary microseism. Really nothing happened all day besides some opportunistic commissioning and out of lock work.
LOG:

15:30UTC In DOWN due to very high secondary microseism
    - Decided to run an initial alignment just for fun
        - Issue with FSS oscillation
    16:47 Decided to take the ifo to IDLE from ACQUIRE_DRMI since it wasn't catching and we wanted to do some out of lock commissioning                                                                                                                                                                   

Start Time System Name Location Lazer_Haz Task Time End
15:48 FAC Randy YARM n Caulking even more joints 18:35
17:35 ISC Sheila, Alicia, Rene LVEA n Ground ITM ESDs 17:55
18:01 IO Kar Meng Opt Lab LOCAL JAC alignment 19:21
18:03 CDS Fil MY n Parts, roll up door 18:35
18:09 TCS Matt CR n CO2 blast on ITMs 19:09
19:28 ISC Sheila, Kar Meng LVEA n Looking for optics 19:40
19:37 TCS Matt LVEA n Turning off side bands 19:45
20:45 SPI Corey Opt Lab n Optics cleaning 00:13
21:26 FAC Tyler Site n Moving big red to the tractor shop 21:46
22:14 IO Betsy Opt Lab n JAC optics 00:13
22:14 VAC Gerardo, Travis, Jordan EY n Purge air and pump work 23:32
22:15 CDS Dave MY, EX n Looking for cables and checking on equipment 23:45
23:46 PCAL Tony, Oli PCAL Lab N Gone fishin' 00:32
Displaying report 1-1 of 1.