TITLE: 11/15 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Microseism
INCOMING OPERATOR: Ibrahim
SHIFT SUMMARY: Unsuccessful day of locking, microseism continues to decrease, its starting to get below the 90th percentile, the wind has also calmed down over the past hour. We have been able to lock DRMI a few times, the highest we've made it has been MAX_POWER.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 15:28 | FAC | Randy | MidY to CS | N | Caulking BeamTube joints | 22:51 |
| 15:30 | FAC | Nellie | OSB | N | Open receiving doors | 16:30 |
| 16:45 | FAC | Mitch | Site | N | Dust monitor vaccum pump checks | 17:49 |
| 18:33 | PSL | Kar Meng | Optics lab | Y | ISS array | 20:09 |
| 21:06 | PSL | Kar Meng | Optics lab | Y | ISS array | 23:40 |
| 21:59 | ISC | RyanS | OPtics lab | N | CLeaning optics | 23:38 |
| 23:04 | CAL | Tony | PCAL lab | LOCAL | Start measurement | 23:20 |
16:11 UTC IA