Reports until 16:03, Friday 14 November 2025
LHO General
ibrahim.abouelfettouh@LIGO.ORG - posted 16:03, Friday 14 November 2025 (88109)
OPS Eve Shift Start

TITLE: 11/15 Eve Shift: 0030-0600 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Microseism
OUTGOING OPERATOR: Ryan C
CURRENT ENVIRONMENT:
    SEI_ENV state: USEISM
    Wind: 13mph Gusts, 6mph 3min avg
    Primary useism: 0.05 μm/s
    Secondary useism: 0.55 μm/s 
QUICK SUMMARY:

IFO is LOCKING in ENVIRONMENT

Microseism is terrible but trending down. Wind has also been terrible but seems to be getting ok. Hoping to get locked during this shift as the microseism continues to trend down/