TITLE: 11/18 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 146Mpc
INCOMING OPERATOR: Ibrahim
SHIFT SUMMARY: One lockloss with an easy relock after running IA. We've been locked for 7 hours, Happy last day of 04!
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 15:35 | FAC | Randy | Yarm | N | Mid to CS BT joint caulking | 22:57 |
| 16:12 | FAC | Nellie | MIdY | N | Tech clean | 16:49 |
| 16:15 | FAC | Kim | MidX | N | Tech clean | 17:15 |
| 16:20 | PEM | Robert | LVEA | N | Set up PEM measurements | 16:34 |
| 17:18 | ISC | Corey | Optics lab | N | Optics cleaning, flow bench | 18:05 |
| 17:19 | ISC | RyanS | Optics lab | N | Optics cleaning | 18:04 |
| 18:27 | FAC | Kim | H2 | N | Tech clean | 18:38 |
| 18:45 | PEM | Robert | LVEA | N | Check on measurement | 18:54 |
| 19:02 | VAC | Travis, Betsy | VAC PREP lab | N | Parts check | 19:09 |
| 21:24 | ISC | RyanS | Optics lab | N | Optics cleaning | 22:19 |
| 21:33 | CAL | Tony | PCAL lab | LOCAL | Prep measurement | 21:45 |