Reports until 15:46, Tuesday 18 November 2025
LHO General
ryan.short@LIGO.ORG - posted 15:46, Tuesday 18 November 2025 (88164)
Ops Eve Shift Start

TITLE: 11/18 Eve Shift: 0030-0600 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: TJ
CURRENT ENVIRONMENT:
    SEI_ENV state: USEISM
    Wind: 13mph Gusts, 9mph 3min avg
    Primary useism: 0.06 μm/s
    Secondary useism: 0.47 μm/s 
QUICK SUMMARY: H1 has been locked for almost 2 hours and team PEM is running measurements.