TITLE: 11/18 Eve Shift: 0030-0600 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: TJ
CURRENT ENVIRONMENT:
SEI_ENV state: USEISM
Wind: 13mph Gusts, 9mph 3min avg
Primary useism: 0.06 μm/s
Secondary useism: 0.47 μm/s
QUICK SUMMARY: H1 has been locked for almost 2 hours and team PEM is running measurements.