Jonathan and Yuri
This is a continuation of WP 12886. This is the last physical step in the control room/MSR for the reconfiguration. We ran a fiber from the warehouse patch pannel to h1daqdc0 and replaced the network card with a newer card. We will be renaming h1daqdc0, likely to h1daqkc0 (daqd kafka connector), and converting it to send the IFO data into the LDAS as part of the NGDD project.
Next steps on this work is to work on the software setup, and to install the corresponding fiber patch in the LDAS room.