thomas.shaffer@LIGO.ORG - posted 16:28, Wednesday 19 November 2025 (88178)
Ops Day Shift End

TITLE: 11/20 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY: Currently at low noise, PEM characterization all day and one SQZ measurement started. There was one lock loss during the shift caused by us trying to move the corner station sensor correction off while in lock to allow Robert and a UW visitor look at the ITMY seismometer. Didn't work. Relocking was an initial alignment and then waiting at DRMI while we still had SC off, but all auto. 
LOG:

Start Time System Name Location Lazer_Haz Task Time End
16:25 PEM Robert, Sam, Genevieve CR/LVEA n PEM measurements, in and out of the LVEA all day 22:05
17:07 FAC Kim, Nellie OSB n Opening receiving roll up door 17:22
17:48 PEM Robert, Sam EX n Setup measurement 19:33
19:34 SEI Richard, UW desert n Checking on the vault seismometers 20:25
19:42 SYS Betsy Opt Lab n Check on lab 19:47
20:22 IO Corey Prep lab n JAC table enclosure 22:58
20:57 SQZ Sheila CR n SQZ meas. 22:07
21:40 VAC Travis EY n Check in mech room 22:04
21:56 SQZ Sheila, Kar Meng Opt Lab n OPO unboxing 23:00
22:04 PEM Sam, Genevieve, Jennie LVEA n Move speaker 22:40
22:06 PEM Robert, UW Paul LVEA n Look at seismometer 23:21
22:13 PEM Richard LVEA n Join Robert and Paul 22:39
23:22 pem Robert, Sam, Genevieve EX n Set up shaker 00:11