TITLE: 11/20 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY: Currently at low noise, PEM characterization all day and one SQZ measurement started. There was one lock loss during the shift caused by us trying to move the corner station sensor correction off while in lock to allow Robert and a UW visitor look at the ITMY seismometer. Didn't work. Relocking was an initial alignment and then waiting at DRMI while we still had SC off, but all auto.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 16:25 | PEM | Robert, Sam, Genevieve | CR/LVEA | n | PEM measurements, in and out of the LVEA all day | 22:05 |
| 17:07 | FAC | Kim, Nellie | OSB | n | Opening receiving roll up door | 17:22 |
| 17:48 | PEM | Robert, Sam | EX | n | Setup measurement | 19:33 |
| 19:34 | SEI | Richard, UW | desert | n | Checking on the vault seismometers | 20:25 |
| 19:42 | SYS | Betsy | Opt Lab | n | Check on lab | 19:47 |
| 20:22 | IO | Corey | Prep lab | n | JAC table enclosure | 22:58 |
| 20:57 | SQZ | Sheila | CR | n | SQZ meas. | 22:07 |
| 21:40 | VAC | Travis | EY | n | Check in mech room | 22:04 |
| 21:56 | SQZ | Sheila, Kar Meng | Opt Lab | n | OPO unboxing | 23:00 |
| 22:04 | PEM | Sam, Genevieve, Jennie | LVEA | n | Move speaker | 22:40 |
| 22:06 | PEM | Robert, UW Paul | LVEA | n | Look at seismometer | 23:21 |
| 22:13 | PEM | Richard | LVEA | n | Join Robert and Paul | 22:39 |
| 23:22 | pem | Robert, Sam, Genevieve | EX | n | Set up shaker | 00:11 |