TITLE: 11/20 Eve Shift: 0030-0600 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: TJ
CURRENT ENVIRONMENT:
SEI_ENV state: CALM
Wind: 9mph Gusts, 6mph 3min avg
Primary useism: 0.02 μm/s
Secondary useism: 0.33 μm/s
QUICK SUMMARY: H1 has been locked for about 30 minutes and PEM measurements are ongoing.