TITLE: 11/20 Eve Shift: 0030-0600 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: PEM measurements were running smoothly until a lockloss @ 01:28 UTC. Since H1 is having a bit of trouble getting relocked (locklosses during LASER_NOISE_SUPPRESSION and DRMI) for reasons I'm unsure of, I've set things to run overnight the same as last night, with H1_MANAGER attempting to keep H1 up but not call for help. I've also set Sheila's SQZ angle stepper script to start at 09:00 UTC (01:00am PST) running on cdsws39 with the hope that H1 is locked.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 01:13 | CAL | Tony | PCal Lab | N | Changing spheres | 01:21 |
| 01:40 | PEM | Robert, Sam, Genevieve | EX -> LVEA | N | Moving shaker | 02:50 |
| 02:12 | VAC | Gerardo | LVEA | N | Checking AIP controller | 03:02 |
IFO locked and was in NLN, but not observing, because I'd left a pico controller enabled and it was causing an SDF diff. I disabled it and now we are in observing.