Reports until 20:10, Wednesday 19 November 2025
LHO General
ryan.short@LIGO.ORG - posted 20:10, Wednesday 19 November 2025 - last comment - 21:08, Wednesday 19 November 2025(88180)
Ops Eve Shift Summary

TITLE: 11/20 Eve Shift: 0030-0600 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY: PEM measurements were running smoothly until a lockloss @ 01:28 UTC. Since H1 is having a bit of trouble getting relocked (locklosses during LASER_NOISE_SUPPRESSION and DRMI) for reasons I'm unsure of, I've set things to run overnight the same as last night, with H1_MANAGER attempting to keep H1 up but not call for help. I've also set Sheila's SQZ angle stepper script to start at 09:00 UTC (01:00am PST) running on cdsws39 with the hope that H1 is locked.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
01:13 CAL Tony PCal Lab N Changing spheres 01:21
01:40 PEM Robert, Sam, Genevieve EX -> LVEA N Moving shaker 02:50
02:12 VAC Gerardo LVEA N Checking AIP controller 03:02
Comments related to this report
sheila.dwyer@LIGO.ORG - 21:08, Wednesday 19 November 2025 (88181)

IFO locked and was in NLN, but not observing, because I'd left a pico controller enabled and it was causing an SDF diff.  I disabled it and now we are in observing.