TITLE: 11/20 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
SEI_ENV state: CALM
Wind: 6mph Gusts, 4mph 3min avg
Primary useism: 0.02 μm/s
Secondary useism: 0.30 μm/s
QUICK SUMMARY: Locked for 6 hours but it looks like the squeezer has an issue. Working on it now. Dust alarm in the diode room, but other than that, no alarms overnight.
Notifications from the SQZ suite of guardians:
SQZ_MANAGER - request Reset_SQZ_ASC_FDS
SQZ_OPO_LR - "pump fiber rej power in ham7 high, nominal 35e-3, align fiber pol on sqzt0."
SQZ_LO_LR - "LOW OMC_RF3 power < -22! Align SQZ-OMC_RF3, or more CLF power if aligned."
This seems like a similar situation as alog87361
I ended up doing these things: