Ops Day Shift End

TITLE: 11/20 Day Shift: 1530-2330 UTC (0730-1530 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY: Locked for 13.5 hours. PEM characterization continues. The useism has been on the rise the last few hours.
LOG:                              

Start Time System Name Location Lazer_Haz Task Time End
15:47 FAC Nellie Opt lab n Tech clean 16:09
15:48 FAC Randy Yarm n Y1 beam tube sealing 23:01
18:45 FAC Kim, Nellie OSB n Rolling up roll up door 19:05
18:50 PEM Robert, Genevieve LVEA n Move the speaker cable 19:27
19:30 PEM Robert, Genevieve LVEA n Readjusting the shaker rod 19:43
20:05 IO Corey Opt Lab n JAC optics cleaning 22:05
21:05 PEM Robert, Genevieve, Carlos LVEA N Moving shaker to BSC3 21:29
21:22 SQZ Sheila, Kar Meng Opt Lab LOCAL OPO testing 21:50
21:24 CDS Marc MY n Grabbing parts 23:22
22:51 SUS Oli CER n Writing down a number 22:55
23:05 PEM Robert, Genevieve, Sam LVEA n Look at and alter the shaker 23:13
23:23 SQZ Sheila, Kar Meng Opt Lab - Looking for tool pan in area past card reader, then going to optics lab for more OPO work 01:23